The Maelfa Regeneration Scheme in Llanedeyrn, Cardiff is designed to provide the area with a vibrant, inviting centre for the local community. It comprises two elements: a redevelopment of the existing shopping centre, and the refurbishment of Ty Maelfa – a high-rise block of 45 flats for which CS was selected by the contractor, Bouygues (UK), to supply and install continuous screening louvres on the building’s roof.
Work on the Ty Maelfa project was finished in July 2019. The tower’s exterior façade was completely transformed with new windows, refurbished balconies, now featuring coloured glass screens, new rainscreen cladding and thorough cleaning of brickwork. The redesigned ground floor, the creation of a communal residents’ lounge and a new shop completed the scheme.
CS’ SLA Screening Louvre system was specified for the tower’s roof to hide the existing plant equipment and transmission masts located there. This easy to install screening solution is generally used in locations where rain penetration is acceptable. Its main function is to screen and hide unsightly equipment whilst providing airflow to the area.
The system is delivered in component form for assembly on site and features extruded aluminium blades fitted horizontally at 100mm pitch and with a 66mm overall depth including supporting mullions. There is a selection of blade shapes to choose from and for Ty Maelfa ‘Z’ shape blades were specified. Due to the position of screening on top of the tower the blades were fitted in inverted orientation, providing optimum screening performance when looking from lower ground level.
The original specification from project’s developer, Cardiff Community Housing Association, called for full-height screening for the tower roof to completely obscure the equipment located there. However, following input from telecommunications providers, the height of the installation was reduced to 1,000mm to prevent microwave transmissions from being impeded.
Due to the tower being exposed to high winds at roof level, a peak velocity pressure for windward wall and roof of 1.10 kN/m2 needed to be allowed for. This required a substantial structural steel frame to be installed first to sufficiently support the rainscreen cladding and screening louvres.
In total, 1,236m of aluminium SLA Z-shaped blades and 234m of support mullions were fitted. The system was supplied powder coated to Grey RAL 7047 to complement the building’s façade.
The refurbished tower block’s improved exterior aesthetics have been complemented by the installation of CS’ SLA-Z Screening Louvre system, which conceals the vital plant equipment from public view.
Qual è il prossimo passo
Specifiche tecniche
Il motivo principale per l'installazione dei louvre è quello di consentire il passaggio dell'aria. L'installazione dei louvre è un equilibrio tra forma e funzionalità, e le facciate a louvre hanno un ruolo molto importante nel processo di selezione.
Confronta i nostri
Per aiutarla a trovare la Louvre giusta all'interno della nostra gamma completa, abbiamo preparato una scheda di confronto, evidenziando le prestazioni chiave e le informazioni estetiche di ciascuno dei nostri modelli.
Scopri come
I tuoi progetti sono unici, così come lo sono le sfide da affrontare – ed è in questi casi che facciamo la differenza. Forti di anni di esperienza, passione ed assistenza senza pari, ti aiuteremo ad affrontare i progetti più complessi.

Sostenibilità ambientale
In qualità di azienda manifatturiera sostenibile, riconosciamo il nostro impatto sull'ambiente e ci impegniamo a migliorare. La lega standard che utilizziamo per produrre le nostre lamelle contiene almeno il 55% di contenuto di scarti riciclati pre e post-consumo. Abbiamo anche ottenuto la certificazione Cradle to Cradle Bronze per tutte le lamelle prodotte nel nostro stabilimento di Westcott.